HVAC Solutions

FLOW MASTER

Testing | Adjusting | Balancing | Energy Audit
Providing a range of engineering technical expertise to various sectors of the industry.
About Us

About Flow Master

Founded in 2017 Flow Master was established to provide support to the balancing activities, providing a range of expertise in engineering technical expertise to various sectors of the industry.

Types of Business

What We Do

Services We Offer

Air & Water Balance (TAB)

HVAC Testing, Adjusting and Balancing (TAB) are the three major steps used to achieve proper operation of heating, ventilating and air conditioning (HVAC) systems. In general, the TAB specialist performs air and hydronic measurements on the HVAC systems and adjusts the flows as required to achieve optimum performance of the building environment.

Hospital Accreditation Acceptance Testing for Annual Recertification

Hospitals are required to perform annual testing of critical areas such as operating rooms, patient isolation rooms and decontamination rooms to comply with their certifying accreditation agency. Annual recertification testing usually consists of Air Exchange Rates and Room Pressurization Testing, but may also include Indoor Air Quality Testing, Particle Count Testing and more.

Restaurant & Kitchen Hood Testing

Restaurant kitchen hood testing is required by the city for certificate of occupancy. Having a kitchen hood setup for the correct airflow is not only a requirement, but it is also for safety, comfort and energy savings.

Additional Services

Our Approach

HVAC Testing, Adjusting and Balancing

Testing and balancing involves the adjustment and balancing of HVAC components to ensure that both the design and specifications are met.

Our TAB team work closely and in conjunction with all contractors to identify and correct any problems at the installation phase that might affect the testing and balancing.

Testing and balancing is not only carried out on new installed systems. We recommend that re-balancing be carried out after the following:

Testing and balancing of an existing building/system can be performed wherever there is a reason to believe the system is not functioning as designed or records do not reflect the actual system operation.

On completion of the testing and balancing, a full report is produced providing a complete and accurate record of the installed equipment and performance test sheets which are placed within the operating & maintenance manual.

Tests To Be Achieved and Balanced

Tests Are Accomplished By

System Test Report

A complete system test report shall be provided on air movement systems, including flow rates, temperatures, and pressures as follows:

Test Procedures

(1) The testing, adjustment and balancing of all equipment and system, shall be carried out and testing and balancing report shall be issued according to general procedures for testing and balancing for:

(A) ASHRAE Std., Testing, Adjusting and Balancing of Heat, Ventilation, Air Conditioning and Refrigeration Systems.

Statement

Flow Master are committed to being recognized as the natural choice to offer our services to and project clients. FMS’s growing reputation for the services we offer our clients is unrivalled. We have created the organization structure and supporting processes to deliver optimal results.

Vision

Within Flow Master, our primary objective is to grow and achieve recognition and status for our commitment to deliver an unparalleled service, unequalled quality and always within time & budget philosophy, for both ourselves and our clients, whilst remaining dedicated towards the task, mission & core values.

Our Tools

List of Equipment

S. No.Equipment NameQty
1Air Capture Hood2
2Air Velocity Meter4
3Air Velocity Transducer2
4Duct Tester1
5Indoor Air Quality Meter2
6Multi-Function Meter2
7Rotating Vane Anemometer3
8Tachometer2
9Water Flow Meter (Ultrasonic)2
10Hydronic Manometer HM6851
11Comdronic Manometer1

Air Capture Hood (TSI)

Air Velocity Meter

Hydronic Manometer HM685

Air Capture Hood (TESTO)

Comdronic Manometer

Duct Tester

Indoor Air Quality Meter

Multi-Function Meter

TSI Manometer

Testo Manometer (testo 420)

Rotating Vane Anemometer

Tachometer

Water Flow Meter (Ultrasonic)

Our Portfolio

List of Projects / Clients

Industries

  • Int. Packaging (Lahore)
  • Ismail Industries (Hub)
  • EBM (Karachi)
  • K-Electric (Karachi)
  • Midas Safety (Karachi)
  • Orient Energy (Karachi)
  • Amreli Steels (Karachi)
  • Snack City (Hub)
  • Pak Suzuki (Karachi)
  • FPCL (Dhabeji)
  • SUPARCO (Karachi)
  • Lucky Energy (Kathore)
  • Mehran Plastic (Karachi)
  • Liberty Mills (Karachi)
  • Yunus Textile (Karachi)
  • Arif Habib Centre (Karachi)
  • AM Unit 5 (Karachi)
  • Pearl-Continental (Gwadar)
  • Novatex (Karachi)
  • Oxford Uni Press (Karachi)
  • Pepsico (Lahore)
  • Gul Ahmed (Karachi)
  • AG Gigi Offices (Karachi)

Hospitals

  • Liaquat National (Karachi)
  • Dow Ojha Campus (Karachi)
  • Aga Khan (Karachi)
  • PNS Shifa (Karachi)
  • Indus Hospital (Karachi)
  • SIUT Mehrunnisa (Karachi)
  • Tabba Kidney Institute (Karachi)

Shopping Malls / Shops

  • Giga Mall / WTC (Islamabad)
  • Nueplex Rashid Minhas (Karachi)
  • New Zamzama Mall (Karachi)
  • RJ Mall (Karachi)
  • SPAR (Karachi)
  • Bahria Complex III & IV
  • Chase Up (Karachi)
  • Sindbad DMC (Karachi)
  • L’Oreal (Karachi)
  • Lucky One Mall (Karachi)
  • Gul Plaza (Karachi)
  • Chase Value (Karachi)
  • Imtiaz Malir Cantt (Karachi)
  • KFC (Karachi)
  • British Council (Karachi)
  • B.B.Q Tonight (Karachi)
  • Charles & Keith (Karachi)
  • Zeytin (Karachi)
  • J. DMC Clifton (Karachi)

Pharmaceuticals

  • GSK (Karachi)
  • Sami Pharma (Karachi)
  • Indus Pharma (Lahore)
  • Hilton Pharma (Karachi)
  • Merck (Quetta)
  • ATCO Laboratories (Karachi)
  • Getz Pharma (Karachi)
  • Surge Lab (Sheikhupura)
  • Sanofi Aventis (Karachi)
  • Asian Continental (Karachi)
  • GEL Pharma (Hub)
  • Abbott Landhi (Karachi)
  • AGP Pharma (Karachi)
  • Gatron (Karachi)
The People

Our Team

S. No.NamePosition
1Mr. Umair WahidHead of Business Development
2Mr. Syed Adeel AhmedHead of Business Development
3Mr. Raheel AhmedManager Operation's & Accounts
4Mr. Wasi KhanProject Engineer
5Mr. Shahbaz GhoriSr. TAB Engineer
6Mr. Ahsan ShaikhSr. TAB Engineer
7Mr. UzairTAB Engineer
8Mr. Ilyas RehmanTAB Engineer
9Mr. Naveed KhanTAB Engineer
10Mr. ArsalTAB Engineer
11Mr. UsamaTAB Engineer
12Mr. MusabHelper
13Mr. SiddiqHelper

Engineering Staff

S. No.DescriptionNos.
1Commissioning / Technical Manager1
2Mechanical Engineers2
3Electrical Engineers2
4Helpers3
On Site

Pictorial View

Contact

Get in Touch With Flow Master

Scroll to Top