It is indeed great pleasure to introduce our company Air Control Engineering Services (ACES) as an expert primarily in Heating, Ventilation, Air Conditioning & Refrigeration (HVAC-R) projects & associates application. Since the inception in HVAC field Air Control has earned renowned & distinct name through provision of our outstanding expertise & services.
We from ACES platform exclusively provide following professional services:
ACES has the knowledge of prevailing standards, & safety practices at all levels of management, installation, commissioning, operation & maintenance to all type of HVAC system. Quality in the work is ensured through adherence to the use of correct materials, conformity to specifications and execution of specific jobs by skilled manpower.
Installation & commissioning of Air Conditioning systems of (all type) complete in all respect.
Planning, measurement, sizing & routing of duct, chilled water piping, drain network, control wiring, MCC & MCCB complete in all respect.
Drawings and bill of quantities preparation.
Water supply system (cooled & hot water), drainage, plumbing fixtures & fittings, sanitary drainage etc.
Fire protection systems.
Utilities and services.
Maintenance jobs.
| S. No. | Name | Position |
|---|---|---|
| 1 | Mr. Mustafa Ali | C.E.O |
| 2 | Mr. Wasi Khan | Project Engineer |
| 3 | Engr. M. Shahzeb Khan | Project Engineer |
| 4 | Engr. Emmad Ali | Project Coordinator |
| 5 | Mr. Uzair Rizvi | Project Coordinator |
| 6 | Mr. Naveed | Site Supervisor |
| 7 | Mr. Intekhab Haider | Site Supervisor |
| 8 | Mr. Abid | Site Supervisor |
| 9 | Mr. Zain-ul-Abideen | Site Supervisor |
| 10 | Mr. Zahid | Site Supervisor |
Capacity: 350 TR
Type of System: Central System
Name of Client: International Consultant (HVAC Consultant)
Capacity: 300 TR
Type of System: Central System
Name of Client: Y.H Associates (HVAC Consultant)
Capacity: 120 TR
Type of System: Packaged type A/C System
Name of Client: M/s SUPARCO
Capacity: 28 TR
Type of System: Split type Ducted type A/C System
Name of Client: Faysal Bank
Capacity: 80 TR
Type of System: Split Ducted Type Packaged A/C System
Name of Client: Naveed-ul-Hussan Architect
Capacity: 60 TR
Type of System: Central System
Name of Client: M/s English Biscuit Pvt. Ltd
| Projects | Value | Status |
|---|---|---|
| Fauji Meat Limited (Admin Block, VRF) | 6.7 Million | Completed |
| Fauji Meat Limited | 20 Million | Completed |
| English Biscuit Ltd (Mixing & RUFC Area F.F) | 4 Million | Completed |
| Indus Pharma Plot 63 (Pvt) Ltd | 9.3 Million | Completed |
| Indus Pharma (Utility Depart Plot 63 (Pvt) Ltd) | 2.4 Million | Completed |
| Indus Pharma Plot 64 (Pvt) Ltd | 4.5 Million | Completed |
| Dollar Industries | 1.3 Million | Completed |
| GUL Plaza Shopping Mall Maintenance (Basement) | 1.0 Million | Completed |
| DOLMAN Shopping Mall (Shops) | 1.5 Million | Completed |
| GSK Pharma Office Extension Project | 2.4 Million | Completed |
| Baradari (Car Parking Ventilation) P.C. Hotel, Lower Basement & Upper Basement | 9.6 Million | Completed |
| Baradari (Fire Fighting) P.C. Hotel, Lower Basement & Upper Basement | 8.2 Million | Completed |
| Maritime Technology Complex | 4.0 Million | Completed |
| Wyeth Pharma Maintenance (yearly) | 2.5 Million | Completed |
| Pfizer Pakistan Ltd | 1.2 Million | Completed |
| IBA SUKKUR Academic Block | 15.5 Million | Completed |
| SHABBIR TILES Office Building Unit 2 | 1.8 Million | Completed |
| SHABBIR TILES Office Power House Unit 1 | 1.9 Million | Completed |
| SHABBIR TILES Control Building Unit 2 | 1.14 Million | Completed |
| SHABBIR TILES Laboratory Building Unit 2 | 1.24 Million | Completed |
| SUPARCO PLANT Building No 8 | 2.6 Million | Completed |
| English Biscuit Ltd (Cutting & Mixing Area G.F.) | 1.5 Million | Completed |
| S. No. | Name of Tools and Machinery | Quantity |
|---|---|---|
| 1 | Rectifying 450 AMP Welding Machine | 2 No. |
| 2 | Rotary 450 Amp Welding Machine | 1 No. |
| 3 | Transformer 250 Amp Welding Machine | 1 No. |
| 4 | Gas Cutting Set, Torch & Gauges | 02 Sets |
| 5 | Scaffolding Pipe 10 Rft to 20 Rft | 300 Rft. |
| 6 | Scaffolding Joints | 100 No. |
| 7 | Chain Block 01 Ton to 05 Tons | 2 No. |
| 8 | Oxygen Cylinder | 2 No. |
| 9 | LPG Cylinder | 02 No. |
| 10 | Power Grinder 7" | 03 No. |
| 11 | Power Grinder 4" | 4 No. |
| 12 | Spirit Level | 4 No. |
| 13 | Right Angle | 4 No. |
| 14 | Hammer 2 Lbs to 10 Lbs | 10 No. |
| 15 | Threading Set ½" to 2" | 2 Set |
| 16 | Pipe Cutter | 2 No. |
| 17 | Pedestal Drill Machine | 1 Set |
| 18 | Hilti Drill Machine | 3 Sets |
| 19 | Speed Grinder 14" | 2 Sets |
| 20 | Charging & testing manifolds | 2 Sets |
| 21 | Sheet metal tools for duct fabrication | 2 Sets |
| 22 | Flaring tool | 2 Sets |
| 23 | Sheet metal press binder 6ft | 1 Set |
| 24 | Vacuum pump | 1 Set |
The following technical staff is working in our workshop for installation, maintenance & service to meet the client’s requirement.
| Designation | No. |
|---|---|
| Site Supervisors | 5 |
| Duct Fabricators | 6 |
| Duct Fabricators Helpers | 10 |
| Pipe Fabricators | 3 |
| Pipe Fabrication Helpers | 5 |
| Technicians | 5 |
| Technician Helpers | 10 |
| Electrician | 2 |
| Electrician Helpers | 4 |
| Electronics Technician | 2 |
| Electronic Helpers | 2 |
Licence of Pakistani Constructor/Operator